Thursday, June 5, 2014



Bridge Design Challenge

Our team consisted of Connor, Corin, Lauren, and Me. The bridge building design took many revisions. We started out building two main pieces and connecting them with angled supports. We then copied that design and built supports between the two sides. The first design held around 400 batteries before it broke. Then we revamped it adding more supports, at about the weight of two batteries it held around 1200!!! That showed a 1:600 ratio while following the constraints. Unfortunately we are missing the one person who has pictures, however we do have pictures of cats.(and a sketch i guess)